Projects - CEG-4188 - Fall 2010

General informations

For each project, there should be two teams working on its realization. Note: this year, there is only one team

For each project, there are the following phases of work:

  1. Analysis of the problem and definition of the communication protocol between the different system components (jointly done by the two teams)
  2. Implementation and test of the system (separately by the two teams)
  3. Verification of the campatibility of the two systems developed by the two teams (done in collaboration)

Schedule

Content and format of the report

The report should contain the following sections:

Note: The user interface is not so important and may remain simple - as long as a demonstration of all the possibilities of the implemented system can be given.

List of possible projects: